HDPE Gas Pipe is widely used in the construction industry because of the good advantages of HDPE Gas Pipe, but before the HDPE Gas Pipe is used, it should be fully prepared to avoid any problems in the later stage. As an HDPE Drainage Pipe Factory, we have the following recommendations.

Before installing the HDPE Gas Pipe, it is necessary to dig the trench, and the trench is the place where the excavated soil should be properly stacked, and the trench should not be too close, and the distance should be more than two meters. The excavated earthwork should be transported to the outside in time to avoid affecting future work. In the construction of HDPE Gas Pipe, mechanical operation must be used, and the machine can be dug up to 20 cm above the bottom of the designed groove. The rest can be excavated by workers.

In order to ensure the safety of the construction, the construction period and the quality of the construction, it is necessary to fully understand and investigate the soil quality and groundwater level of the required construction site before construction, so as to ensure that there will be no accidents during construction.

HDPE Gas Pipe



back to list
Share
hot news